Skip to product information
1 of 46

WKNDS Wear

Tailored Chino Shorts (Version 2)

Tailored Chino Shorts (Version 2)

Regular price ₱275.00 PHP
Regular price ₱325.00 PHP Sale price ₱275.00 PHP
Sale Sold out
Shipping calculated at checkout.
Color
Size

WKNDS Tailored Shorts Plain Chino Shorts for Men
Crafted from premium cotton twill fabric, these shorts offer a sleek and polished look with a relaxed feel. The versatile design makes them perfect for both casual outings and more formal occasions. With a tailored fit and classic silhouette, our Chino Shorts provide a timeless addition to your summer wardrobe.

Key Features:
• Cotton Twill Fabric
• Above The Knee Cut
• 3 Pockets
• Garterized with Drawstring/Lace
• Reinforced Stitching (Bartack)
• 2 Sizes Available (M, XL)
• 90% cotton

View full details